Grade, volume, slump, delivery notes and the cubes you took, written down on the day of the pour. The tool works out when each cube is due for testing and tells you the moment one is late. Free. No sign-up. Nothing uploaded.
Filled in once. Every pour you record afterwards starts from these, so you only type them the first time. Leave anything blank and it is simply left off the document.
The ages your cubes get crushed at, and who crushes them. The ages drive every due date and every late flag in this tool, so they are worth getting right once. Standard practice is 7 and 28 days.
One entry per pour. Two pours in a day is normal, so give each one its own reference and the tool will keep them apart.
The checks somebody will ask about the day a cube fails. Answer them here and they are printed on the record with the pour, dated, rather than remembered differently by two people six months later.
One line per truck. The volumes are added up for you, so the total placed comes off the delivery notes rather than off memory. Leave this empty and the volume you typed above is used instead.
One line per cube. Give it the mark that is written on the cube itself and the age it is to be crushed at, and the test date works itself out. Fill the strength in when the certificate comes back. Leaving the strength blank is what keeps the cube on the outstanding list, which is the point.
Saving keeps the pour on this device so it can be reopened when the cube results come back. The register is built from everything you have saved.
Everything saved in this browser. Change the project or the period and the totals follow. The strength figures below count 28 day results only, because that is the age the concrete is accepted at.
Cubes with no strength recorded against them yet, oldest first. Anything red is past its test date.
The pour record is the one sheet you file and copy to the contractor on the day. The cube register is every pour on the job with its results and its outstanding tests. The compliance summary is the acceptance document: results by grade, mean, lowest and the spread.
The free documents carry a small IT Civils line in the footer. Pro replaces it with your company name and logo, and unlocks the compliance summary. One payment, once, no subscription.