A worked example

This is the job the page opens with, already worked out. Change any figure above and the answer changes with it.

The job

Length of the run
200 m
Kerb unit length
1 000 mm
Bedding width
300 mm
Bedding thickness
100 mm
Haunch width
150 mm
Haunch height
150 mm
Breakages and waste
5 %
Concrete mix
1:3:6, foundations and footings, about 15 MPa

The answer

210units  ·  Kerb units

Run at 1 000 mm per unit
200
Bedding concrete
6 m³
Haunching concrete
2.25 m³
Concrete total, with 5%
8.662 m³
Cement, 50 kg bags
38.44 bags
Sand
4.002 m³
Stone
8.004 m³

The working

Bedding 300 × 100 mm = 0.0300 m² per metre.
Haunch is a triangle, ½ × 150 × 150 mm = 0.0112 m² per metre.

What it assumes

All eighteen calculators

Every one has its own page, so you can bookmark the one you use most.

Concrete and masonry

Earthworks and roads

Roofing and finishes

Setting out and levels

On the job

2 Stay in the loop

Get the next tool when it lands

New tools get built when the admin gets annoying enough. Leave your email and you will hear when the next one lands. What you do on site is what decides what gets built, so it is worth saying.

Why these are free, and what they assume

These come from ten years on site: first in contracting on production and civil works, then in consulting doing construction monitoring for consultants appointed by the City of Cape Town. Working a quantity out twice, because the first answer was on a piece of board that blew away, is a thing that happens to everybody.

Every calculator shows the formula it used and the assumptions it made, because a number with no working behind it is worth nothing on site. Where a figure varies by material or supplier, it is an input you can change rather than something hidden. Check the answers against your own specification and your supplier's own figures before you order. These help you work faster, they do not replace your own judgement.

If they save you time, the paid IT Admin Buster packs cover the admin side: progress report templates, daily diaries, inspection checklists and the wording banks that go with them.